| Sign In | Join Free | My chinacsw.com |
|
Packaging Details : Wooden frame or cardboard box packaging, customizable
Shape : C Channel
Certification : ISO9001
Processing Service : Cutting, Decoiling, Punching, Welding, Bending
Place of Origin : Hebei, China
Thickness : 0.5-3.0mm or Customer's Requirements
MOQ : 1000 pieces
Application : Building operations
Payment Terms : T/T, PayPal, Xtransfer
Process : Semi-welding + Stamping Forming
Delivery Time : Delivery within 15-30 days
Bearing Capacity : 500-2000
Supply Ability : 50000 pieces per day
Material : Q235/Q355 high strength steel
Price : $ 0.9-2.4
Fully‑Welded Trailing Arm for 41×82 C‑Section Steel, Heavy‑Duty Bracket Fitting for Solar, Cable Tray & Seismic Support Systems
| Parameter Name | Specification | Unit |
|---|---|---|
| Material | Q235 / Q355 High‑Strength Carbon Steel | — |
| Adapted C‑Section Steel | 41×82 Double‑Spliced C‑Strut Channel | mm |
| Processing Technology | Fully‑Welded + Stamped Forming | — |
| Anti‑corrosion Treatment | Hot‑dip Galvanizing / Powder Coating | — |
| Bearing Capacity | 800‑3000 | N |
| Applicable Temperature | ‑40 ~ 80 | ℃ |
| Service Life | ≥15 | Year |

|
|
Durable Fully Welded Trailing Arm for 41x82 Double Spliced C Strut Channel with Full Penetration Welding and Anti Corrosion Surface Treatment Images |